SaabCentral Forums banner

Mods you have done and will be doing

2K views 18 replies 12 participants last post by  vagrantradio 
#1 ·
I though this would be fun list the mods you have done in the last 6 months and what you want to do in the next 6 months.

Last 6 months

-Tranny swap from a 00 9-5 with 88k on it
-HID kit
-Repainted lip and added the home depo lip

Next 6 months

-GS short shifter
-Spacers / longer bolts
-Fix the side of my car ( old man hit me )
-Get my stage 3 running ( new maf )
-Cut out catalytic converter and get ecu tuned to run catless.
 
#2 ·
Done:
'01 Aero hard intercooler pipe/insulating wrap.
Bailey DV
HIDs
"Blackened" the headlights/grill.
Aero clear side markers
De-badged rear.
Additional heat shield over DP

Doing Right Now :
Springs and delete mid-muffler, it's labor day after all here in US.

Doing Future:
Upgrade front mount IC and fab intercooler pipes
Aero To4 turbo swap
 
#3 ·
Done:

Sold car

To do:

..........hmmmm
 
#6 ·
Like Chris 9-5, might get rid off my 95 Estate, as ran it twice in last two weeks. It spends it time sat in the yard at work, while I'm on call.

Need to do:
Get advisory items done from Mot:
Front drop links.
Rear Rose bush (might as well do both sides).
New rear discs.

Try and get rid of some of the little scratches (touch up).
Find out whats causing the noise from front (not engine).

Done:
New drivers door (cause of dent).
Coloured the roof rails. Silver.
Coloured the door trims.
New SiD unit.
US styled the front indicators (orange side lights).
Coloured the front grill (swapped black on top chrome underneath)
Dropped sump + cleaned.
 
#7 ·
mods already done:

bleh, dont want to list them just look @ my profile!

mods I REALLY want to do:

coilovers
JT 3'' exhaust
18-19inch works/volks
19T compressor wheel
rear mini-spoiler

unfortunately though, i might also sell the car. :(
 
#13 ·
Done:

Nothing, really. I painted my brake calipers today...

What I want:

Lower
new rims
larger brakes
'04 Aero bumper
side skirts
Nordic Stage 2

It probably won't be in the next six months, but that's what I want in the next year or so.
 
#16 · (Edited)
modest mods

Done:
Tinted Windows
Extra set of 16 rims with snow tires
Trans mount from GS
S&B air filter from GS
Weather Tech Side window deflectors
Rubber Mats (including rear cargo area mat)

To Do:
Short shift kit from GS
Braided brake lines


Way down the road (most likely will not happen, like the gas mileage):
Dual Exhaust (BSR) & 3 " down pipe
Stage 3 Tune
 
#17 ·
modded the corner lights myself. Still running on standard clear units, drilled the rear blank and fitted orange side bulbs and wired to the front sidelights.
Car might be going as a friend I work with likes it. Depending if it goes and how much for, I may go back to a Laguna.....(Diesel)........ aaaarrgghh.
"Love the Xenons, just like the Saab needs treating with CARE".
 
#18 ·
Done so far...

Poly anti roll bar bushes (Front) Rear yet to do
Limited Slip diff
Koni FSD's
GS Poly gearbox mount
04+ Air Intake pipe
Braided brake hoses

Next up....

Front brake upgrade kit
Stage 1 or 2 Tuning
Upgraded Turbo
GS Short shifter
 
#19 ·
So far:

Aero Plastic Bits & Paint
GS 3" full exhaust w/ Magnaflow Sport Cat
GS Open Air Intake
Aero Cobra
BSR Stage 3 Tune
PCV Upgrade
Silicone Hoses

To Do:

Damn Fuel Filter
18' Enkei EKM3 Gunmetal Wheels/Tires
Aero Front Brake Upgrade
Paint Calipers Black
Coilovers/Drop
GS Short Shifter

Whew, I'm going to need two more jobs!
 
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top